Site Plan Review
Process
1. All land uses shall be subject to site plan
approval, except a detached single-family dwelling on a lot or parcel
not having any other dwelling existing or to be located thereon and
non-residential uses requiring less than five (5) parking spaces.
2. Persons interested in developing in Cascade Township must submit
an application form and a site plan consistent with the attached site
plan checklists. An application fee is also required.
3. Following the filing of the proposed site plan, application and
fee, the Planning Department will review the plan with other
appropriate Township departments and/or Kent County agencies for
design sufficiency.
4. The applicant must initially submit five (5) complete, scaled
sets of the preliminary site plan drawings for Township review.
The timeline described below will only apply to complete applications.
The submission of an incomplete application will delay the project.
5. Within fifteen (15) days of submittal of the preliminary site
plan, the Site Plan Review Committee, consisting of the Planning,
Building and Fire Departments and the Township Engineer will meet and
review the project. Following the meeting, the Planning
Department will submit a report to the applicant outlining site plan
deficiencies (if any) which shall be corrected prior to review of the
revised site plan by the Planning Commission. Review of the site
plan by this committee does not relieve the applicant from complying
with all relevant building codes.
6. The applicant shall submit twelve (12) copies of the revised,
scaled site plan drawings.
7. Upon receipt of a revised site plan, the Planning Department
will submit the site plan with a report and recommendation within
twenty (20) days to the Planning Commission for their review.
The Planning Commission must respond to the site plan within thirty
(30) days of receiving a recommendation by the Planning Department.
8. Before a site plan is marked “approved”, it shall be revised to
reflect any conditions attached to the approval, or changes or
corrections required to obtain approval.
9. If approval is conditioned with changes, the applicant must
agree in writing to the changes prior to the issuance of any building
permits.
10. When an applicant receives site plan approval, the site must be
developed exactly as approved by the Planning Commission.
11. Approval of the site plan by the Planning Commission does not
eliminate the need for the applicant to apply for and receive a
building permit from the Building Department before construction
commences.
12. An approved site plan is effective for a period of one (1)
year, or the life of the building permit obtained pursuant to the
approved site plan, whichever is longer. If construction is not
commenced within the period that the site plan is effective, no
construction can take place unless there has been an extension
approved by the Township Board. Before an extension is granted,
there must be compliance with all applicable site plan requirements in
effect at the time of the extension request.
13. If rezoning of the land is required to allow the proposed
development or use of the property as provided for in the site plan, a
concept approval of the site plan by the Township Planning Commission
shall be considered contingent upon rezoning of the subject property
by the Township Board; such concept site plan approval shall not be
construed as any assurance of such rezoning nor shall it be binding on
the applicant if the rezoning is approved.
14. In the event that a site plan is denied, the applicant may
submit an appeal to the Zoning Board of Appeals requesting relief from
the Planning Commission action.
Criteria of Review
1. In order to receive Township approval, the site plan must comply
with all applicable requirements of the Township as well as the Zoning
Ordinance or have received specific variances to allow the project to
deviate from the required standards.
2. The site plan must also satisfy the following criteria before
receiving Planning Commission approval.
a. Whether the required information has been furnished in
sufficiently complete and understandable form to allow an accurate
description of the proposed use(s) and structure(s) in terms of
density, location, area, height, bulk, placement, setbacks,
performance characteristics, parking and traffic circulation.
b. Whether there are ways in which the configuration of use(s)
and structure(s) can be changed which would improve the impact of
the development on adjoining and nearby properties, persons, and
activities and on the community, while allowing reasonable use of
the property within the scope of the district regulations and other
regulations of the Zoning Ordinance that are applicable to the
property and proposed use and structures.
c. The extent to which natural features and characteristics of
the land will be preserved; the regard given to existing large
trees, natural groves, watercourses, and similar natural features
that would add attractiveness to the property and environs if they
were preserved; the preservation of natural drainage systems, the
dedication and/or provision, where appropriate, of scenic easements,
natural buffering, and other techniques for preservation and
enhancement of the physical environment.
4. Whenever the nature of the proposed development makes
information or documents such as the following relevant, such
documents or information shall be provided.
a. Documentation confirming ownership of subject property.
b. Certification from other agencies that utility systems are or
will be adequate to handle the development, and that all easements
have been provided.
c. Performance guarantees.
d. Time schedule for completion of phases.
e. Environmental impact assessment.
f. Fiscal Impact Analysis.
g. Traffic Impact Analysis.
4. Once site plan approval has been granted by the Planning
Commission, changes to the approved site plan shall require
re-submission and payment of fee.
5. The Planning Commission may require a performance guarantee in
an amount equal to the estimated cost of road, lighting, utility,
sidewalk, landscaping, and drainage improvements associated with the
project.
Miscellaneous Engineering Requirements
Water
- Hydrants should be placed at no more than 500 foot intervals.
- Each service lead to a site must have its own separate tap to
the public watermain.
- All watermain and appurtenances within right-of-ways or public
easements must conform with City of Grand Rapids standards and be
approved by the City Water Department prior to final site plan
approval.
- Open cuts of the public roadway must receive official approval
from the Kent County Road Commission.
- Fire hydrant and protection line locations must be approved by
the Cascade Charter Township Fire Department prior to site plan
approval.
Sanitary Sewer
- Manholes should be placed at no more than 400 foot intervals.
Stabilized access drive must be provided for all public manholes
located outside the right-of-way.
- A private lateral or main cannot be connected to another private
lateral. All laterals must connect directly to the public
main.
- Private force mains must discharge to a gravity sewer before
entering a right-of-way or public easement.
- All sanitary sewer and appurtenances within right-of-ways or
public easements must conform with City of Grand Rapids standards
and may be subject to review by the city prior to final site plan
approval.
- Open cuts of the public roadway must receive official approval
of the Kent County Road Commission.
Other
Issues concerning power, telephone, gas and cable should be
directed to the governing utility company.

Government
~ Departments ~
Community
Business ~
Reference Desk ~
What's Happening
Help ~
Home ~ Search ~ Site Map
Comments? Feedback? Questions? Click here to send an email.
Site Use Policy
This page last modified
06/08/04.
All information © 2003-2004Cascade Township, Michigan
|
Site
Design/Development by
 |
|