Planning
Commission Minutes
MINUTES
Cascade Charter Township Planning Commission
Monday, July 10, 2006
7:00 p.m.
ARTICLE 1. Chairman Goldberg called the meeting to order at 7:00
p.m.
Members Present: Goldberg, Koessel, Lewis, Logue, MacAllister,
McDonald, Postma, Richards, Robinson.
Members Absent: None
Others Present: Planning Director Peterson, Deputy Clerk Biegalle and
approximately eight (8) members of the public.
ARTICLE 2. Chairman Goldberg led the Pledge of Allegiance to the
Flag.
ARTICLE 3. Chairman Goldberg requested motion for approval of the
July 10th agenda. Member Robinson motioned for approval of the agenda,
supported by Member Richards. The motion carried.
ARTICLE 4. Member Koessel requested on page 4 (four) of the June 5,
2006 minutes (at the top of the page) there is a grammatical error as
it relates to some discussion we had back and forth about the cell
tower, the content is correct, it is just not grammatically correct.
Motion was made by Member Lewis and supported by Member Robinson to
give Deputy Clerk Biegalle the freedom to make the change as requested
and also to approve the minutes as corrected. Motion carried.
ARTICLE 5. Case #05-2747 Oak Harbor
Recommendation to the Township Board for approval of the PUD Rezoning
with the PUD Ordinance.
Chairman Goldberg asked Staff for a presentation. Planning Director
Peterson stated that there were a couple of things that needed to be
noted. The Planning Commission has already had the Public Hearing and
has awarded the Preliminary Approval back in November. The applicant
is getting some the final issues together back in front of the
Planning Commission for the recommendation for the Township Board. The
rear yard setbacks, which were extended to forty (40) feet has
occurred, with the exception of Lot 11. In getting the Township
Engineers approval, they are putting in small "detention
pond". They have shortened up Lot 11 by about 100 ft., leaving
Lot 11 with a normal twenty-five (25) foot setback. Planning Director
Peterson is asking the Planning Commission makes a recommendation to
the Township Board for approval of the plan as you see it and with the
PUD Ordinance in front of the Commission. The applicant has reviewed
the document and has approved the language.
Chairman Goldberg opened the meeting for questions of Staff and
Member Lewis inquired about the rear lot lines regarding if it took
land out of the natural reserve area. Planning Director Peterson
stated that it did not. They already had the buffer zone that we had
asked for.
Member MacAllister asked if a nature preserve pathway was a
condition of this project. Planning Director Peterson said that the
ten (10) conditions were listed and there was not a condition of
phasing in the walkway.
Being no other Commissioners' comments, Chairman Goldberg asked the
Applicant if he wanted to add anything during the meeting. Dan
Schaafsma from Latitude Engineering and Surveying was present
representing Koetje Builders and Developers. Mr. Schaafsma had no
additional comments.
Chairman Goldberg requested a motion and Member Lewis motioned for
a recommendation to the Township Board for approval of the PUD
Rezoning with the PUD Ordinance, supported by Member McDonald. Motion
carried.
ARTICLE 6. Case #06-2812 MVP Sportsplex
The applicant is requesting a basic plan review for the redevelopment
of two existing PUD's into a new Planned Unit Development.
Planning Director Peterson reviewed the site plan with the
Commission. The project incorporates two existing PUD's, one is an
existing driving range and the other was originally approved for
multiple office buildings, only one office has been built with the
rest remaining vacant.
Planning Director Petersen reviewed his submitted Staff Analysis as
follows:
" The applicant is requesting Basic Plan Review in order to
redevelop the existing driving range and the vacant portion of the
Spruce Meadows office project into a new project.
" The project consists of outdoor soccer fields and an indoor
facility. The small pro shop that is in use for the driving range
would also remain and serve in a similar fashion.
" The driving range property (Cascade Golf Center) was
approved as part of its own PUD rezoning in 1992. I have attached the
existing Cascade Golf Center PUD ordinance for your review. As you
will see some specific development standards were approved to
recognize the adjacent residential homes along Kraft Ave. The
underlying zoning for the driving range was R1 residential. The
current Master Plan designation is commercial. As you will see from
the current uses listed in the Cascade Golf Center PUD, similar type
of recreation uses are allowed.
" The Spruce Meadows project was approved in 1994 and to date
only one office buildings was constructed. This project has some
specific development standards also due to the residential use to the
east. I have attached the existing Spruce Meadows P.U.D. for your
review. The underlying zoning was B-2. The current Master Plan
designation is commercial.
" The plan does not provide any vehicular connection to the
Turnberry project to the north. This connection was planned for when
Turnberry was approved.
" The pedestrian connection that is being made to Turnberry
does not appear to be very "pedestrian friendly". Other
options should be explored to come up with a more "pedestrian
friendly" connection.
" Our regulations require 1 parking space per 4 persons at
capacity. The plan meets that requirement.
" The applicant should also provide the calculations for the
parking lot landscaping to make sure that they have provided the
required amount of landscaping.
" Height of the building proposed is shown as 39' to the peak
and 34'to the midpoint. The standard for the current project is 35' to
the midpoint.
" They have proposed a pathway extension that would provide a
connection from 28th St Ct to their north property line. This
connection would then eventually connect to the path along Burton to
the sidewalks along 28th St.. The applicant should provide
documentation from Turnberry and the KCRC that the connection could be
made. If the vehicular connection is not made at the west side of the
property this may be a more "pedestrian friendly" area to
make the pedestrian connection.
" Lighting at the site needs to be provided especially for any
night activity of the fields. The lighting plan should include the
light levels and pole height of each pole.
" The applicant shows two large signs on the side of the
buildings. Both of these signs exceed the normal allowance for wall
signage. I believe they are also planning on utilizing the existing
ground mount sign that the driving range currently uses. The driving
range also has signage on the off-premise sign along 28th St, Kraft
Ave and the highway sign in front of Meijer.
" The applicant has indicated that the stormwater from the
site will be handled by the existing stormwater system in the area.
They have obtained a letter from the KCDC regarding this. This will
need to be confirmed by FTCH.
Planning Director Peterson stated that before proceeding to the
Preliminary Development plan review (Public Hearing), he would
recommend that the Planning Commission address the following:
1. Have FTCH confirm that the stromwater issues can be handled by
the existing infrastructure.
2. Discuss the allowance for increase in wall signage as a total sign
package.
3. Have the developer provide a photometric lighting plan.
4. Have the developer provide the hours of operation for the buildings
and fields.
5. Have the developer provide details of the screening between the
homes on Kraft Ave and their project.
6. Have the developer provide details of the parking lot landscaping
7. Discuss the vehicular connection to Turnberry.
Chairman Goldberg inquired whether or not the Turnberry Developer
had been spoken to regarding the project and what was their reaction
to the project. Planning Director Peterson stated the Turnberry
Developer had been contacted by both the applicant and himself.
Planning Director Peterson also said the Turnberry Developer was
generally in support of the project. They identified a few items i.e.,
the screening issues, hours of operation, lighting.
Chairman Goldberg opened the meeting for questions of Staff and
Member McDonald asked what the buffer was and how close it is going to
be to the bike path. Planning Director Peterson stated that it is 50
ft to the path.
Member MacAllister asked for an explanation of the direction we are
going to take with the pathways on the Meijer site. There seems to be
not connectivity with this site and Meijer. Is there any opportunity
to link this to this project. Planning Director Peterson stated that
the proposed pathway would provide the first link and then eventually
you would go south towards and east through the private drive. Member
MacAllister said she was thinking along the 28th St. Ct. Road to have
that connection and then bringing it into the two facilities. Is there
any "loop" of sidewalk connection?
Planning Director Peterson stated that his priority was to connect the
Burton St. to the 28th St. sidewalks to provide for that connection on
the way through. He did not see that this would be a pedestrian
connection site.
Member MacAllister inquired about signage requirements and also
viewing bleachers and team areas.
Chairman Goldberg asked who was present on behalf of the applicant.
Peter Baldwin with AMDG Architects was present with Mike Baker from
Excel Engineering as well as Carl Droppers, Vice President of MVP
Sports. Mr. Baldwin did an overview with a Power Point presentation to
the Board regarding the proposed complex. Some of the issues addressed
were as follows:
" Geared toward family
" Fieldhouse is tailored to host Leagues (i.e.,
basketball/volleyball)
" Outdoor facilities (field soccer/lacrosse)
" Natural Buffer
" Parking
" Lighting
" Signage
" Landscaping
" Pedestrian traffic
After much discussion, the following items will be required to be
provided/clarified to the Planning Commission prior to the Public
Hearing:
" Address the comments from FTCH e-mail dated 7/6/06
" Address the Comments from the Cascade Fire D department letter
dated 7/3/06.
" Limit the total sign package to no more than 400 sq. ft for all
signage, including the off-premise signs.
" Provide a photometric plan that includes the type of fixtures
and the height of each pole.
" Provide a description of the type and location of security
lighting that is planned.
" Provide the hours of operation for the buildings and fields.
This includes both indoor and outdoor activities.
" Provide details of the screening between the homes on Kraft
Ave. and the project to the north. This should include type of
screening as well as location and whether or not the landscape
screening is on your property or not.
" Provide the calculations for internal parking lot landscaping
as well as the type of planting proposed.
" Provide interior sidewalk connections between the fields,
parking areas and building.
" Provide different options on what can be done to make the
façade more attractive or break up the large mass of the building
especially as it relates to the North side of the building.
" Indicate on the plans the location and size of the proposed
bleachers.
" Provide details of the planned Public Address system. When will
the system be used and where will the speakers be located?
" What type of natural and man made screening will be sued to
prevent play equipment from entering the property to the North.
ARTICLE 7. Case #06-2807 Zoning Ordinance Amendment, Antenna
Proposed Amendments for Antennas.
Chairman Goldberg request Planning Director Peterson to review the
changes as shown in the handout to the Planning Commission.
Planning Director Peterson stated that the changes are an attempt to
limit the location to specific items as well as provide some criteria
for increasing the height of an antenna. Planning Director Peterson is
asking the Planning Commission to set the Public Hearing to invite the
public in to consider the request for the August 7th, meeting.
Member MacAllister asked if the images incorporated in the
amendment be added as exhibits. Planning Director Peterson thought
that it would be a good idea.
Member Koessel questioned, "power towers" that run
through residential areas referencing the 12 months clause. Planning
Director Peterson stated that did not have 12 months it was if it
becomes unused for 12 months. Then they have 90 days to remove it.
Discussion followed.
Planning Director Peterson stated that if everything looked all
right, that Staff would notice it for Public Hearing.
ARTICLE 8. Case #06-2813 Zoning Act Amendment
Proposed Amendments as a result of PA 110 of 2006 - Michigan Zoning
Enabling Act.
Planning Director Peterson reviewed the "cleaning up"
changes within the Zoning Enabling Act. The attorneys noticed that we
had some repetitive criteria for zoning variances that needed to be
cleaned up. The other change was to come in line with the new act.
There are some changes for notification requirements, which require
some applicants to have their stuff a little bit into staff on a more
timely basis because of those noticing requirements. Other than that,
it is "cleaning up" as a result of the Act and the Township
Attorney taking a look at the entire chapter. Planning Director
Peterson was asking for a public hearing to be set for August 7th.
Member Lewis asked if the Board of Zoning Appeals get a copy of the
proposed changes. Planning Director Peterson said there would be no
problem with that. Discussion followed.
ARTICLE 9. Other Business
Member Koessel brought up an issue the Township Board had asked to
bring to the Planning Commission regarding a restriction on vehicle
storage in the side yard of a residential property. Planning Director
Peterson clarified the Township Boards request as determining if the
issue is a zoning issue or a nuisance issue. Discussion followed.
ARTICLE 10. Adjournment
Member Robinson moved to adjourn with Member MacAllister supporting.
Motion carried.
Meeting adjourned at 8:50 p.m.
Respectfully submitted,
Claude Robinson, Secretary
Denise M. Biegalle, Deputy Clerk

Government
~ Departments ~
Community
Business ~
Reference Desk ~
What's Happening
Help ~
Home ~ Search ~ Site Map
Comments? Feedback? Questions? Click here to send an email.
Site Use Policy
This page last modified
06/08/04.
All information © 2003-2004Cascade Township, Michigan
|
Site
Design/Development by
 |
|