PUD Ordinance -
Noto #13 of 1995
CASCADE CHARTER TOWNSHIP
Ordinance #13 of 1995
Amended by Ord. No. 17 of 2003
AN ORDINANCE TO AMEND THE CASCADE CHARTER TOWNSHIP
ZONING ORDINANCE AND ZONING MAP TO ESTABLISH THE
CASCADE TOWNSHIP - NOTO PROPERTIES
PLANNED UNIT DEVELOPMENT PROJECT
Cascade Charter Township Ordains:
Section I. An Amendment to The Cascade Charter Township Zoning
Ordinance
The application received from Cascade Township and Noto Properties
or their assigns (hereinafter referred to as the
"Developer"), for Planned Unit Development designation for
the proposed restaurant / banquet facility and various government
facilities (hereinafter referred to as the "Project" or the
"Premises") was recommended by the Cascade Charter Township
Planning Commission for approval on June 5, 1995. The Project is
recommended for rezoning from B1, Village Business to PUD, Planned
Unit Development permitting the development of a restaurant / banquet
facility and various government facilities. This action requires an
amendment to the Cascade Charter Township Zoning Ordinance and Zoning
Map to incorporate the Planning Commission's recommendation and the
Cascade Charter Township Board of Trustees' action on June 7, 1995.
Section II. Legal Description
The legal description of the Project is as follows:
Part of the Northwest ¼ of Section 16, T6N, R10W Cascade Township,
Kent County, Michigan, including Lots 7,8,9 and the east part of Lot
10 of Arden Hills Plat, described as: commencing at the North ¼
corner of said Section 16; thence N 90 degrees 00'00" W 1,174.75
feet along the North line of said Section 16; thence S 00 degrees 08'
00" E 63.13 feet to the Northeast corner of Lot 7 of said Arden
Hills Plat and also to the Point of Beginning; thence S 00 degrees
08'00"E 147.25 feet along the East line of said Lot 7; thence S
89 degrees 52'50" E 143.29 feet along the South line of said
Arden Hills Plat to the SW corner of Lot 4 of said Plat; thence S 00
degrees 24'05" W 400.00 feet along the West line of Lot 4
extended; thence S 89 degrees 52'50" E 311.04 feet; thence S 00
degrees 45'E parallel with the N-S ¼ line 15.5 feet to a point 627.0
feet South from North Section line and 631.0 feet West from N-S ¼
line; thence S 90 degrees 00'W parallel with North section line 29.0
feet; thence S 00 degrees 45' E parallel with N-S ¼ line 268.0 feet
to a line 895.00 feet South of the North line of said Section 16;
thence S 90 degrees 00'00"W 1,036.97 feet along said line 895.00
feet South of the North line of said Section 16; thence N 00 degrees
00'00"W 220.00 feet; thence S 90 degrees 00'00"W 400.00 feet
to the East line of Thornhills Drive (100 feet wide); thence N 00
degrees 18' 00" E 35.00 feet along the East line of Thornhills
Drive; thence N 90 degrees 00'00" E 399.82 feet; thence N 00
degrees 00'00" W 35.00 feet; thence N 90 degrees 00'00" E
159.56 feet; thence N 00 degrees 05' 40" W 541.14 feet to the
North line of Arden Hills Plat; thence N 89 degrees 51'40" E
341.99 feet along the North line of Arden Hills Plat to the Point of
Beginning. Subject to easements, restrictions, and rights-of-way of
record.
And
Part of the Northwest ¼ of Section 16, T6N, R10W, Cascade
Township, Kent County, Michigan, including Lots 11, 12 and the West
part of Lot 10 of Arden Hills Plat, described as: Commencing at the
North ¼ corner of said Section 16; thence N 90 degrees 00'00"W
1,516.69 feet along the North line of said Section 16; thence South 00
degrees 05'40" E 63.86 feet to the North line of said Arden Hills
Plat and the Point of Beginning; thence S 90 degrees 00'00"W
159.56 feet; thence S 00 degrees 00'00" E 35.00 feet; thence S 90
degrees 00'00" W 399.82 feet to the East line of Thornhills
Drive; thence N 00 degrees 18'00" E 35.00 feet along the East
line of Thornhills Drive; thence N 90 degrees 00'00" E 225.00
feet; thence N 00 degrees 18'00" E 246.03 feet; thence S 89
degrees 52'50" E 58.36 feet to the extension of the West line of
Lot 12 of said Arden Hills Plat; thence N 00 degrees 04'00" W
294.65 feet along said extension of the West line of said Lot 12 to
the Northwest corner of said Lot 12; thence N 89 degrees 52'40" E
274.00 feet along the North line of Arden Hills Plat to the Point of
Beginning. Subject to easements, restrictions and rights-of-way of
record.
Section III. General Provisions
The following provisions shall hereby apply to the Project, in
addition to those Provisions outlined in Chapter 16 of the Cascade
Charter Township Zoning Ordinance (Ordinance No. 11 of 1988, as
amended).
Section IV. Purpose
The Project occupies approximately 14 acres of vacant and partially
wooded land. The Project is proposed to be developed by constructing a
new 16,485 square foot restaurant and banquet facility and a new
township library. Future phases of the project may include the
development of other government related facilities or uses allowed in
the VO, Village Office zoning district. The PUD technique has been
chosen by the Developer to provide more control over the Project's
aesthetics and appearance. This development technique provides the
Developer with the ability to develop the Project in a unified manner.
The regulations contained herein are established to define the
procedures necessary to insure high quality development on the
Project. Additionally, they are designed to achieve integration of
this development with adjacent land uses.
Section V. Approval Limitations
A. The provisions of this Ordinance are not intended as a
substitute for the Cascade Charter Township Zoning Ordinance and the
General Development Plan, nor do they in any way relieve the Developer
from obtaining all approvals and permits required by the township,
except as otherwise expressly provided herein. In the event that a
development issue or site plan element is not addressed by this
Ordinance, the specifications and requirements of the Cascade Charter
Township Zoning Ordinance shall be enforced.
B. Except as otherwise provided herein, the Developer and his
assigns must meet all applicable provisions and regulations of Cascade
Charter Township, as well as federal and state law, and must obtain
all necessary approvals from state and county governmental agencies
that are required for operation or use.
C. This PUD approval is expressly contingent upon all conditions of
approval herein remaining fully effective and valid. If any condition
imposed herein is determined to be illegal or contrary to law as a
result of a successful legal challenge by the Developer or its
assigns, or any other party, the Township reserves the right to review
the entire project under the PUD provisions of the Cascade Charter
Township Zoning Ordinance, and further, to withdraw its approval of
this PUD if it finds that, absent the effect of any condition imposed
herein, the PUD no longer meets the standards for PUD approval
contained in the Zoning Ordinance.
D. All conditions contained herein shall be binding upon the
Developer, as well as its successors, tenants and assigns. The
conditions may be modified or amended only pursuant to a formal
amendment of the PUD approval and ordinance amendment.
E. This approval document shall be recorded with the Kent County
Register of Deeds by the Developer prior to construction occurring on
site and shall run with and bind the lands involved. Copies of this
recorded documents shall be supplied by the Developer to the Cascade
Charter Township Clerk.
F. Failure to comply with the site plan or any condition of
approval herein shall be deemed a violation of the Cascade Charter
Township Zoning Ordinance.
Section VI. Site Plans and Phasing
A. The Project shall be developed in accordance with the overall
site plan approved and signed by the Township. The site plan shall
indicate where each building and structure will be located and provide
appropriate measurements demonstrating compliance with the Zoning
Ordinance. Engineering plans and documents relating to utilities,
topography, drainage, and the survey of the Project shall be reviewed
and approved by the Township Engineer. Approval of these documents
shall be based upon their meeting the requirements of the Zoning
Ordinance and meeting recognized, acceptable engineering standards and
practices. Once it has been determined that the plans have met
Township requirements, the Township Engineer shall sign and mark these
plan documents as "Approved", and forward them to the
Developer.
B. Because the Project is anticipated to be developed over several
years, the Developer, for each individual phase of the Project, shall
submit an application and all necessary architectural and planning
drawings for consideration to the Planning Department. Site plan
approval by the Planning Commission shall be required for any future
phases of the project and shall be granted in accordance with Chapters
16 and 21 of the Zoning Ordinance (as may be amended). All phases of
the Project shall comply with the Permitted Uses listed in Section VII
and the Design Guidelines, Requirements and Limitations contained in
Section III of this Ordinance.
Section VII. Permitted Uses
The permitted uses for the Cascade Township - Noto's PUD are as
follows:
A. One (1) restaurant / banquet facility consistent with the site
plan that was approved for Noto's by the Planning Commission on august
1, 1994.
B. One (1) township library
C. Other governmental or institutional uses.
D. Uses as allowed in the VO, Village Office Zoning District as
found in Chapter 9 of the Zoning Ordinance (as may be amended).
Section VIII. Design Guidelines, Requirements and Limitations
The Project shall be developed in accordance with the overall PUD
site plan approved by the Township. No alterations, expansions or
additions may take place to the Project without an amendment to this
Ordinance, unless authorized otherwise herein.
A. The maximum number of buildings on the Premises shall be limited
to four (4).
B. Maximum Building Height - The maximum height for the buildings
within the Project shall be as follows:
(Amended by Ord. No. 17 of 2003; 11/19/03)
Noto's Building - 34 feet with the allowance for the tower, as
shown on the approved plans, to be 43 feet
Library - 46 feet
Other Buildings - 25 feet
C. Setback Requirements - All buildings shall meet the following
setback requirements:
Front Yard Setback - 40 feet
Side Yard Setback - 25 feet
Rear Yard Setback - 50 feet
D. Minimum Parking Requirements - Parking for each of the
individual uses shall comply with the requirements of the Cascade
Charter Township Zoning Ordinance. Shared parking shall be encouraged
where feasible for any future development.
E. Signs
1. The Project shall be permitted the following signs:
Noto's property:
Those signs approved as part of the site plan approval by the Planning
Commission on august 1, 1994.
Township property:
a. One (1) monument sign with a maximum sign area of 32 square feet
for each building.
b. Wall signs - One wall sign for each building with a maximum sign
area of 100 square feet.
2. Unless otherwise specified above, all new signs for the Project
shall comply with the height, location, size and all other
requirements set forth in the Cascade Charter Township Sign Ordinance,
as amended.
F. Landscaping
1. The project shall be required to install landscaped bufferyards (as
regulated in Chapter 20 of the Zoning Ordinance) with the development
of each site on the property.
2. Landscaping shall be installed within ninety (90) days of
completion of each building unless permitted in writing by the
Planning Director at a later date.
3. All landscaping shall be hardy plant materials and maintained
thereafter in a neat and orderly manner. Withered and/or dead plant
materials shall be replaced within a reasonable period of time but no
longer than one growing season.
G. Transportation Improvements -
The Developer will fund and construct a new internal public road to
serve the premises. These improvements must be reviewed, coordinated
with, and approved by the Kent County Road Commission.
Section IX. Temporary Buildings
No structure of a temporary nature; trailer, tent or construction
shack shall be constructed, placed or maintained within the Project
except accessory to and during construction of building expansions or
infrastructure improvement.
Section X. Utilities
A. The Project shall be served with public water and public sewer
at the Developer's expense. Any new on-site water and sewer design and
connection to the public water and sewer systems shall be approved by
Cascade Township and the City of Grand Rapids prior to installation.
B. Stormwater Drainage - All proposed stormwater drainage
facilities shall be reviewed and approved by the Township Engineer and
the Kent County Drain Commissioner's office prior to the development
of the Project. The Developer shall provide the Township Planning
Department with copies of all correspondence and permits received from
the Kent County Drain Commissioner and Michigan Department of Natural
Resources (if applicable) regarding stormwater disposal.
C. The Developer shall provide all necessary easements within the
Project for telephone, electricity, gas and cable television to the
appropriate utility provider without cost. Said easements shall be
recorded with the Kent County Register of Deeds and provided to each
utility provider for their records.
Section XI. Soil Erosion Control Requirements
Prior to each phase of construction, the Developer shall submit a
soil erosion control plan showing all temporary and permanent soil
erosion control measures to be taken before, during and after
construction on the Project. This plan shall be reviewed and approved
by the Township Engineer prior to commencing any building on the site.
Section XII. Performance Guarantee
To insure compliance with this Ordinance and any conditions herein,
Cascade Township may require reasonable performance guarantees, as
authorized under the Township Rural Zoning enabling Act to insure
completion of improvements such as, but not limited to, landscaping,
drainage, lighting, roads, and utilities. The Township Board,
Engineer, or Planning Department may require such guarantees at any
time they deem necessary to insure completion of the improvements.
Section XIII. Consistency With Planned Unit Development (PUD)
Standards
The rezoning to Planned Unit Development will result in a
recognizable benefit to the ultimate users of the Project and to the
community. The project will offer a unified development that provides
a new internal road system and a central location for future
governmental and institutional uses in the township.
In relation to the underlying zoning (PUD), the Township finds the
Project will not result in a material increase in the need for public
services, facilities and utilities and will not place a material
burden upon the subject property and the surrounding properties. New
road improvements are required as a result of the Project. The
property has been planned and zoned for office or commercial
development and is proposed to be utilized in that fashion.
The Project is not anticipated to cause undo impact to the
stormwater drainage of the surrounding area. All stormwater plans have
been approved by the Township Engineer and the appropriate County and
State agencies. Concerns about fire and emergency vehicle access have
been addressed on the site plan and by this PUD Ordinance.
The Project has been determined by the Township to be compatible
with the General Development Plan of the Township and with the spirit
and intent of the Planned Unit Development Chapter of the Zoning
Ordinance.
The Township finds the Project will not result in an unreasonable
negative economic impact upon surrounding properties.
The Township finds the Project to have at least as much or more
green and unable open space as would be required by the Township
Zoning Ordinance.
Finally, the Township recognizes the Project will be under
ownership and control by two parties. The Township recognizes that the
Developer or its assigns will retain ownership and control of the
Premises.
Section XIV. Effective Date
This ordinance shall become effective upon publication of the
ordinance, or a summary thereof, in The Grand Rapids Press, a
newspaper of general circulation within Cascade Charter Township.
The foregoing Ordinance was offered by Board Member Carpenter,
supported by Board Member Van Strien. The roll call vote being as
follows:
YEAS: Carpenter, Henning, Johnson, Julien, Timmons, Van Strien
NAYS: None
ABSENT: Hansen
Brenda J. Henning
Cascade Charter Township Clerk
CERTIFICATION
I hereby certify the foregoing to be a true copy of an Ordinance
adopted at a Regular meeting of the Cascade Charter Township Board on
the 7th day of June, 1995.
Brenda J. Henning
Cascade Charter Township Clerk

Government
~ Departments ~
Community
Business ~
Reference Desk ~
What's Happening
Help ~
Home ~ Search ~ Site Map
Comments? Feedback? Questions? Click here to send an email.
Site Use Policy
This page last modified
06/08/04.
All information © 2003-2004Cascade Township, Michigan
|
Site
Design/Development by
 |
|