PUD Ordinance -
Old Elm #24 of 1994
CASCADE CHARTER TOWNSHIP
Ordinance 24 of 1994
AN ORDINANCE TO AMEND THE CASCADE CHARTER TOWNSHIP ZONING ORDINANCE
AND ZONING MAP TO ESTABLISH THE OLD ELM SITE CONDOMINIUM PLANNED UNIT
DEVELOPMENT PROJECT
Cascade Charter Township Ordains:
Section I. An Amendment to The Cascade Charter Township Zoning
Ordinance
The application received from TrentonLee Corporation or their
assigns (hereinafter referred to as the "Developer"), for Planned Unit
Development designation for the proposed Old Elm Project (hereinafter
referred to as the "Project" or the "Premises") was recommended by the
Cascade Charter Township Planning Commission for approval on November
21, 1994. The Project is recommended for rezoning from R-1,
Residential to PUD, Planned Unit Development permitting a site
condominium development. This action requires an amendment to the
Cascade Charter Township Zoning Ordinance and Zoning Map to
incorporate the Planning Commission’s recommendation and the Cascade
Charter Township Board of Trustees’ action on December 14, 1994.
Section II. Legal Description
The legal description of the Project is as follows:
That part of the NE fractional ¼, Section 3, T6N, R10W, Cascade
Township, Kent County, Michigan, described as: BEGINNING at the NE
corner of Section 3; thence S 01 degrees 25’36"E 1299.41 feet along
the East line of said NE fractional ¼; thence S 88 degrees 03’00"W
1165.84 feet along the North line of Loral Pines Condominiums and its
Westerly extension; thence N 09 degrees 44’03" E 473.77 feet; thence N
48 degrees 00’00" W 55.00 feet; thence N 06 degrees 46’10"W 816.15
feet to the North line of said NE fractional ¼; thence N 88 degrees
49’18"E 1190.04 feet along said North line to the place of beginning.
Subject to highway R.O.W. for Grand River Drive.
Section III. General Provisions
The following provisions shall hereby apply to the Project, in
addition to those Provisions outlined in Chapter 16 of the Cascade
Charter Township Zoning Ordinance (Ordinance No. 11 of 1988, as
amended).
Section IV. Purpose
The Project occupies approximately 32.434 acres of land that is
generally vacant and wooded, with steep topography. The Project is
proposed to be developed into a site condominium development
containing 24 building sites. The site condominium technique has been
chosen by the Developer and the eventual owners of each condominium
unit to provide more control over the Project’s aesthetics and
appearance. This development technique provides the Developer with the
ability to develop the Project in a manner to meet market expectations
where more traditional mechanisms such as creating land subdivision
plats do not.
The regulations contained herein are established to define the
procedures necessary to insure high quality development on the
Project. Additionally, they are designed to achieve integration of
this development with adjacent land uses.
Section V. Approval Limitations
The provisions of this Ordinance are not intended as a
substitute for the Cascade Charter Township Zoning Ordinance and
the General Development Plan, nor do they in any way relieve the
Developer from obtaining all approvals and permits required by
the township, except as otherwise expressly provided herein. In
the event that a development issue or site plan element is not
addressed by this Ordinance, the specifications and requirements
of the Cascade Charter Township Zoning Ordinance shall be
enforced.
Except as otherwise provided herein, the Developer and his
assigns must meet all applicable provisions and regulations of
Cascade Charter Township, as well as federal and state law, and
must obtain all necessary approvals from state and county
governmental agencies that are required for operation or use.
This PUD approval is expressly contingent upon all conditions
of approval herein remaining fully effective and valid. If any
condition imposed herein is determined to be illegal or contrary
to law as a result of a successful legal challenge by the
Developer or its assigns, or any other party, the Township
reserves the right to review the entire project under the PUD
provisions of the Cascade Charter Township Zoning Ordinance, and
further, to withdraw its approval of this PUD if it finds that,
absent the effect of any condition imposed herein, the PUD no
longer meets the standards for PUD approval contained in the
Zoning Ordinance.
All conditions contained herein shall be binding upon the
Developer, as well as its successors, tenants and assigns. The
conditions may be modified or amended only pursuant to a formal
amendment of the PUD approval and ordinance amendment.
This approval document shall be recorded with the Kent County
Register of Deeds by the Developer prior to construction
occurring on site and shall run with and bind the lands
involved. Copies of this recorded document shall be supplied by
the Developer to the Cascade Charter Township Clerk.
Failure to comply with the site plan or any condition of
approval herein shall be deemed a violation of the Cascade
Charter Township Zoning Ordinance.
Section VI. Site Condominium Documents and Plans
Specific controls relating to architectural elements, common
elements of the site condominium project, construction
materials, size and space requirements, improvements and out
buildings, specific prohibitions and rules of conduct shall be
governed by site condominium bylaws and master deed. These
restrictions shall become part of this Ordinance with the
documents labeled and attached in the following manner:
"Exhibit A – Bylaws"
"Exhibit B – Master Deed"
The Project shall be developed in accordance with the site
plan approved and signed by the Township. The site plan shall
indicate where each condominium until will be located and
provide appropriate measurements demonstrating compliance with
Section 16.11(2) of the Zoning Ordinance. Engineering plans and
documents relating to utilities, topography, drainage, and the
survey of the Project shall be reviewed and approved by the
Township Engineer. Approval of these documents shall be based
upon their meeting the requirements of "Section 16.11(4) of the
Zoning Ordinance and meeting recognized, acceptable engineering
standards and practices. Once it has been determined that the
plans have met Township requirements, the Township Engineer
shall sign and mark these plan documents as "Approved", and
forward them to the Developer. Only approved plan documents
shall be recorded with the appropriate county and state
agencies.
The number of building sites may be reduced or consolidated
within the Project upon review and approval of the Township
Planning Department. The proposed changes to the site / survey
plan to reduce or consolidate building sites shall be reviewed
by the Planning Department to insure compliance with the Cascade
Charter Township Zoning Ordinance and this PUD Ordinance. Once
approved by the Planning Department, the amended site / survey
shall then be recorded with the Kent County Register of Deeds
Office and the appropriate State agencies by the Developer at h
is cost. A copy of the recorded site / survey plan shall be
forwarded to the Planning Department, so that accurate files
regarding the development can be maintained.
The Project shall be limited to twenty – four (24) building
sites for single family detached condominium units. The number
of building sites within the Project shall not be increased by
the Township Board.
Section VII. Permitted Uses
The permitted uses for the Old Elm PUD are as follows:
Single Family Residences
Accessory buildings customarily incidental to a single family
residence, subject to the provisions of Section 4.08 and 4.09 of
the Cascade Charter Township Zoning Ordinance, as may be
amended.
Signs. Provided all signs for the Project shall conform with
Section 6.02 of the Cascade Charter Township Sign Ordinance
(Ordinance 12 of 1988, as amended).
Section VIII. Design Guidelines, Requirements and Limitations
The layout of the Project shall be developed in accordance with the
site plan approved by the Township. No alterations, expansions or
additions may take place to the Project without an amendment to this
Ordinance, unless authorized otherwise herein.
Maximum Number of Residential Units – The maximum number of single
family detached site condominium units within the Project shall be
limited to twenty – four (24) units.
Maximum Building or Structure Height – 35 feet or 2-1/2 stories
whichever is the lesser.
Setback Requirements – All buildings and structures (except signs)
shall meet the following minimum setback requirements:
1. Front Yard Setback: 35 feet from the front yard area line.
Front Yard Averaging – Where the average front yard setback of two
(2) or more condominium units within two-hundred (200) feet of the
site in question and on the same side of the street is greater than
the minimum front yard setback prescribed above, then the required
front yard setback of such unit shall not be less than the average
existing front yard setback of such condominium units.
2. Side Yard Setback: 10 feet minimum from the side yard area line
for one and 25 feet minimum with both sides combined.
3. Rear Yard Setback: 25 feet from the rear yard area line.
Minimum Floor Area – Each site condominium unit shall contain
a minimum of 1,600 square feet of finished livable area above
grade level, exclusive of the garage, decks, porches and
breezeways.
Minimum Parking Requirements – Each site condominium dwelling
unit shall have a minimum of two (2) enclosed off-street parking
spaces.
Section IX. Private Street Development
The Developer shall submit a street construction, maintenance
and pavement plan consistent with Section 16.11(4)(f) of the
Zoning Ordinance. The Developer may establish a private street
to serve the Project provided the road is constructed in
accordance with the "Cascade Charter Township Engineering Design
Requirements and Standards for Private Streets" and the
following specifications:
4. The road grades shall not exceed an 8 percent grade. All grades
shall be sufficient to allow safe ingress/egress of emergency
vehicles.
5. The private street shall be posted with a sign stating the
street name. This sign shall be consistent with Kent County Road
Commission standards and requirements and shall be installed at the
Developer’s cost.
6. A clear vision triangle shall be established by the Developer to
insure safe turning movements to and from the Project onto Grand River
Drive. This "clear vision triangle" shall be developed to the
specifications established by the Kent County Road Commission.
7. Any private street shall intersect any public road at a 90
degree angle.
8. Copies of any permits required by the Kent County Road
Commission to connect the private street to any public road shall be
provided to the Township Planning Department by the Developer.
In accordance with Section G of the "Cascade Charter Township
Engineering Design Requirements and Standards for Private
Streets", the Developer of the Project shall provide a
disclosure statement on all property deeds to all owners of the
private street, all those who utilize the private street and all
persons securing a building permit to construct a building or
structure served by the private street, by applying for and
securing a building permit for construction of a building or
structure that utilizes the private street, all such persons
shall use the private street at their own risk and the Township
shall not be responsible for any aspect of the private street.
In accordance with Section I of the "Cascade Charter Township
Engineering Design Requirements and Standards for Private
Streets", it shall also be the responsibility of the Developer
and its successors or the individual property owners to fully
maintain and keep the private access street in good repair at
all times and to ensure that snow and ice is removed in a timely
fashion during the winter.
With regards to the development of Condominium Lot Sites 14 –
24 (Phase 2), the following additional specifications shall
apply to the development of the private street:
1. The minimum paved cul-de-sac radii shall be 45 feet.
This cul-de-sac may have a landscaped island centered on
it’s center point provided that it does not have a radii
exceeding 25 feet.
2. The minimum paved cross – section width shall be
twenty – eight (28) feet, with:
a. Two (2) travel lanes that are each 12 feet wide.
b. Two (2) valley/rolled curbs that are each 2 feet
wide.
E. No combustible building materials may be erected on the
Project until a temporary access road is constructed to within 100
feet of the furthest point of a structure. Such road shall be a
minimum 18 feet wide and be able to support 20 tons on a single
axle with dual wheels and standard road tires.
Section X. Fire / Emergency Service
A. Since two (2) means of access to the Project cannot be
obtained by the Developer, the Township shall require the
developer to install a cistern near the terminus of private street
called "Oak Hill Drive". The cistern shall have a minimum capacity
of 15,000 U.S. gallons and shall be installed with the appropriate
piping and connections to provide service to fire apparatus from
Cascade Charter Township. This cistern shall be installed and
approved by the Cascade Charter Township Fire Department before
any building permit is issued for Condominium Lot Sites 14 – 24.
B. From the engineering specifications submitted by the
Developer for the Project, it appears that the private access
street for the Project will have a continuous grade of eight (8)
percent, with a length exceeding 1000 feet. It is uncertain
whether municipal emergency and fire fighting vehicles or
conventional vehicles will be able to get up this grade on the
access road (Oak Hill drive) at all times, particularly during
inclement weather. Therefore, the Developer understands and
recognizes that the Township (as well as other assisting
municipalities, if any) might not be able to provide emergency
and/or fire fighting equipment or services at all times within the
proposed Project on the access road mentioned in the paragraph
above (Section X.A.).
C. The real estate disclosure statement required in Section
IX.B., above (page 6) shall also include the following statement
for condominium lot sites 14 – 24 relating to fire protection:
"It is uncertain whether Cascade Charter Township emergency and
fire fighting vehicles will be able to get up the grade on Oak
Hill Drive at all times, particularly during inclement weather.
Therefore, the developer, builder or condominium home owner of
each individual condominium lot sites is encouraged to install a
fire suppression system consistent with NFPA Part 13D, Standard
for the Installation of Sprinkler Systems in One and Two Family
Dwellings and Mobile Homes".
Section XI. Temporary Buildings
No structure of a temporary nature; trailer, tent or construction
shack shall be constructed, placed or maintained within the Project
except accessory to and during construction of building expansions or
infrastructure improvement.
Section XII. Utilities
A. Stormwater Drainage – All proposed stormwater drainage
facilities shall be reviewed and approved by the Township Engineer
and the Kent County Drain Commissioner’s office prior to the
development of the Project. The Developer shall provide the
Township Planning Department with copies of all correspondence and
permits received from the Kent County Drain Commissioner and
Michigan Department of Natural Resources regarding stormwater
disposal.
B. The Developer shall provide all necessary easements within
the Project for telephone, electricity, gas and cable television
to the appropriate utility provider without cost. Said easements
shall be recorded with the Kent County Register of Deeds and
provided to each utility provider for their records.
Section XIII. Soil Erosion Control Requirements
Prior to each phase of construction, the Developer shall submit a
soil erosion control plan showing all temporary and permanent soil
erosion control measures to be taken before, during, and after
construction on the Project. This plan shall be reviewed and approved
by the Township Engineer prior to commencing any building on the site.
Section XIV. Performance Guarantee
To insure compliance with this Ordinance and any conditions herein,
Cascade Township may require reasonable performance guarantees, as
authorized under the Township Rural Zoning Enabling Act to insure
completion of improvements such as, but not limited to, landscaping,
drainage, lighting, roads, and utilities. The Township Board,
Engineer, or Planning Department may require such guarantees at any
time they deem necessary to insure completion of the improvements.
Section XV. Consistency With Planned Unit Development (PUD)
Standards
The rezoning to Planned Unit Development will result in a
recognizable benefit to the ultimate users of the Project and to the
community. Current and future residents will recognize the benefits of
a residential development which offers a low density land use pattern.
In relation to the underlying zoning (R-1, Residential), the
Township finds the Project will not result in a material increase in
the need for public services, facilities and utilities and will not
place a material burden upon the subject property and the surrounding
properties. The Project is not anticipated to cause undo impact to the
stormwater drainage of the surrounding area. All stormwater plans have
been approved by the Township Engineer and the appropriate County and
State agencies. Concerns about fire and emergency vehicle access have
been addressed by this PUD Ordinance. The requirements contained
herein should provide adequate and safe access provided that the
private streets are diligently maintained by the Developer or his
assigns.
The Project has been determined by the Township to be compatible
with the General Development Plan of the Township and with the spirit
and intent of the Planned Unit Development Chapter of the Zoning
Ordinance. The Project has been determined to be allow low density
residential use, which is consistent with the Cascade Township General
Development Plan.
The Township finds the Project will not result in an unreasonable
negative economic impact upon surrounding properties.
The Township finds the Project to have at least as much green and
usable open space as would be required by the Township Zoning
Ordinance. Due to the large site condominium unit sizes, the amount of
open space may be more in this type of development than a more typical
subdivision plat.
Finally, the Township recognizes the Project will be under single
ownership or control. The township recognizes that the Developer or
its assigns will retain ownership and control of the Premises until a
majority of the site condominium units are purchased for single family
residential purposes.
Section XVI. Effective Date
The foregoing Ordinance was offered by Board Member Henning,
supported by Board Member Johnson. The roll call vote being as
follows:
YEAS: Carpenter, Henning, Johnson, Julien, Timmons and VanStrien
NAYS: None
ABSTAIN: None
ABSENT: Hansen
Brenda J. Henning
Cascade Charter Township Clerk
CERTIFICATION
I hereby certify the foregoing to be a true copy of an Ordinance
adopted at a Regular Meeting of the Cascade Charter Township Board on
the 14th day of December, 1994.
Brenda J. Henning
Cascade Charter Township Clerk
EXHIBIT "A" – BYLAWS
EXHIBIT "B" – MASTER DEED

Government
~ Departments ~
Community
Business ~
Reference Desk ~
What's Happening
Help ~
Home ~ Search ~ Site Map
Comments? Feedback? Questions? Click here to send an email.
Site Use Policy
This page last modified
06/08/04.
All information © 2003-2004Cascade Township, Michigan
|
Site
Design/Development by
 |
|